From the production line to the loading dock, bring us the problem that is costing you money. We find the root cause on site, fix it with your team, and make sure it stays fixed.

Too many defects Output below plan Idle labour Warehouse out of space Warranty claims Sales not growing
Tell us your problem See results

Problems we solve

If it is slowing your factory or warehouse down, or holding your sales back, it is our job to fix it.

Symptom: output below plan

Throughput & yield

Find what is really holding output back, and cut scrap and rework.

Output · Rejects · Downtime

Symptom: store full, line waiting

Warehouse & material flow

Layouts, storage racks, part kits and line supply that use less space and less handling.

Layout · Storage · Material flow

Symptom: slow ramp-up

New line readiness

Assembly cells and lines designed, balanced and ready before ramp-up.

Cell design · Balanced workloads

Symptom: repeat defects

Quality & failure analysis

Find why defects happen, stop them reaching customers, and make sure they do not come back.

Root cause · Lasting fixes

Symptom: good product, thin pipeline

Go-to-market & sales development

Positioning, target accounts, pricing and a sales process that turns enquiries into orders.

Target customers · Pricing · Sales

Our method · DMAIC

How we solve it

The five-step Six Sigma method used by the world's best plants. Scroll down to see each step.

D Define · Step 1 of 5

Agree on the problem

We pin down exactly what is going wrong, what it is costing you, and what success looks like before anything changes.

You getA one-page problem statement with the ₹ at stake

Keep scrolling to move through the steps, or tap a letter.

Results from the floor

From our founder's work in the US before Praluk, across electrical hardware manufacturing, warehousing and automation.

21% → 0% Kitting defects on data center switch and power control lines Global power management manufacturer · USA
+54% Value-added time (time spent on work customers pay for), after studying how work was really done and rescheduling it Global power management manufacturer · USA
−15% Cycle time on custom data center switch and power control builds Global power management manufacturer · USA
$100Ks Saved in warranty costs by stopping connections working loose in the field Global power management manufacturer · USA
−20% Less floor space for storage racks in a new warehouse, with modern inventory software and just-in-time stock Global power management manufacturer · USA
$75k cell Led a five-engineer team designing a semi-automated assembly cell for a new connector line, with three automation-tier options for leadership. Power system protection manufacturer · USA

Case studies

Projects from our founder's work in the US, before Praluk.

Case 01 · Eaton · $1B+ annual plant · USA

Tightening standards that stopped connections working loose

Challenge

In power system cabinets, connections and small devices were coming loose during or after final testing.

What we did

Traced the problem back to an earlier assembly stage: large bolts were checked for tightness, but smaller screws and connections had no standard, so they ended up too tight or too loose. Worked with design and manufacturing to write a tightening guide for small devices and connections.

Result
$100Ks saved in warranty costsNew tightening guide for small screws and connectionsFixed at the source, with design and manufacturing

Case 02 · Eaton · $1B+ annual plant · USA

Zero errors in part kits on data center power lines

Challenge

Lines building custom data center switch and power control units: 21% of kits reached the line with errors, and cycle times ran long.

What we did

Traced where kit errors started and fixed the causes, working with the final assembly and test team.

Result
21% → 0% kit errors−15% time per unit

Case 03 · Eaton · $1B+ annual plant · USA

A modern warehouse with 20% more efficient racking

Challenge

A new warehouse had to be designed from the ground up for a $1B+ plant.

What we did

Designed the layout and storage racks and tested them in a computer simulation, alongside new inventory software and a 90-day just-in-time stock plan.

Result
−20% floor space for racksNew inventory software and just-in-time stock

Case 04 · Eaton · $1B+ annual plant · USA

+54% value-added time through labour optimisation

Challenge

Operators had long idle periods, and it was unclear whether job scheduling matched the real workload.

What we did

Watched how work was really done, recording idle time, walking and movement, and time spent on productive versus non-productive work. Used this to rework the job schedule and fill the idle time.

Result
+54% value-added time

Case 05 · Birck Nanotechnology Center, Purdue University · USA

30% better yield in a cleanroom fab

Challenge

Microchip component production in the Birck cleanroom gave output quality that varied unpredictably from batch to batch.

What we did

Tracked every process step with statistics and found two causes: a wrong machine setting and a change in raw material batch.

Result
+30% yield −20% production time

Case 06 · Schweitzer Engineering Laboratories · USA

A semi-automated assembly cell for a new connector line

Challenge

Schweitzer Engineering Laboratories, launching a new connector line, needed an assembly cell designed within a $75,000 budget.

What we did

Led a five-engineer team through the cell design and costed three levels of automation, so leadership could choose the trade-off between investment and output.

Result
3 costed automation options $75k budget, met in design

Who you'll work with

An industrial engineer trained at Purdue University in the US, with hands-on experience on American plant floors, in semiconductor cleanrooms and on automation design teams.

Six Sigma Black Belt Cleanroom trained
Industrial Engineering
Purdue University, USA
Global power management manufacturer, USA
Quality, warehousing, labour and kitting projects in $1B+ annual plants
Power system protection manufacturer, USA
Semi-automated assembly cell design for a new connector line
University nanofabrication cleanroom, USA
Quality tracking and yield work in microchip cleanroom production
Tools
AutoCAD · FlexSim · SolidWorks · Python · SQL · NIOSH · 3DSSPP

Tell us what is going wrong. We will show you how to fix it.

The first call is free. Describe the problem, and we reply within two business days with how we would approach it.

hello@praluk.com +91 92149 18903 · WhatsApp Chat on WhatsApp